top of page

SQE- Electrical Parts (e2W)

Chennai, Tamil Nadu, India

Job Type

Full time

Job Description

Raptee Energy is an early stage e-mobility startup working on futuristic solutions primarily for next gen commuter motorcycles.

Requirements

Ensure the Parts are approved thro' PPAP system before mass production ( Both NPD, ECN and Capacity Enhancement projects ) for 2 Wheeler Mechanical parts
- Establish systems and processes for eliminating early failures of supplier parts in new products and regular products and maintain consistency
- Support Assembly line to achieve Vehicle Straight Pass Ratio by eliminating the defects in supplier parts
- Ensure the Lot Rejection, Samples Rejection and Line Rejection, Customer Rejection targets are met as per the policy targets
- Ensure effective APQP systems are deployment in Supplier works for any new development ( DFM Studies, FMEA, CP, Cpk Study, Tier 2 selection, FTG implementation, PSW )
- Review progress of achievement of process capability of target quality parameters consistently in manufacturing of supplier parts ( Cpk improvement projects )
- Analyze and implement corrective actions on Supplier products and process and ensure the implemented actions are sustained at supplier works
- Review and control maintenance of all standards pertaining to supplier parts manufacturing
- Conduct Process and System audit at supplier works and ensure the supplier quality Management Systems are sustained and assure Zero Defect supplies consistently
- Effectively implement Product / Process changes to meet Raptee's design requirements with valid PPAP approval
- Communicate to Plant and Suppliers on Product changes and ensure latest QMS documents are available with Supplier
- Establish the Agreement of Inspection, Receipt Inspection Standard, Supplier PDIR before SOP for NPD and ECN Changes
- Ensure 100% FTG ( Fixture, Tools and gauges ) availability prior to mass production and validated thoroughly as part of PPAP approval
- Ensure 100% compliance to IATF 16949 QMS System on daily management activities

Requirements
- Knowledge on E2W Electrical parts development ( Wiring harness,2w lightings, DC-DC Contactor, PDU, VCU, MCU and Motor parts )
- Posses very good manufacturing process knowledge on casting, Machining, Welding, Fasteners manufacturing, Assembly processes etc.,
- Knowledge on Supplier development Quality process ( Domestic and Overseas Customer )
- Hands on Exp in APQP & PPAP Implementation at Supplier Works.- Structured parts approval process with Fix, Tool Gauge validation
- Knowledge on SDCA, PDCA process, Q7 Tools Problem solving techniques, DOE for process optimization
- Statistical Quality Control with Minitab experience
- Skills on Internal auditing skills & IATF 16949 QMS requirements

Responsibilities

Ensure the Parts are approved thro' PPAP system before mass production ( Both NPD, ECN and Capacity Enhancement projects ) for 2 Wheeler Mechanical parts
- Establish systems and processes for eliminating early failures of supplier parts in new products and regular products and maintain consistency
- Support Assembly line to achieve Vehicle Straight Pass Ratio by eliminating the defects in supplier parts
- Ensure the Lot Rejection, Samples Rejection and Line Rejection, Customer Rejection targets are met as per the policy targets
- Ensure effective APQP systems are deployment in Supplier works for any new development ( DFM Studies, FMEA, CP, Cpk Study, Tier 2 selection, FTG implementation, PSW )
- Review progress of achievement of process capability of target quality parameters consistently in manufacturing of supplier parts ( Cpk improvement projects )
- Analyze and implement corrective actions on Supplier products and process and ensure the implemented actions are sustained at supplier works
- Review and control maintenance of all standards pertaining to supplier parts manufacturing
- Conduct Process and System audit at supplier works and ensure the supplier quality Management Systems are sustained and assure Zero Defect supplies consistently
- Effectively implement Product / Process changes to meet Raptee's design requirements with valid PPAP approval
- Communicate to Plant and Suppliers on Product changes and ensure latest QMS documents are available with Supplier
- Establish the Agreement of Inspection, Receipt Inspection Standard, Supplier PDIR before SOP for NPD and ECN Changes
- Ensure 100% FTG ( Fixture, Tools and gauges ) availability prior to mass production and validated thoroughly as part of PPAP approval
- Ensure 100% compliance to IATF 16949 QMS System on daily management activities

bottom of page